← /vasi
IASI
ManufacturingThe industrial VASI. Production procedures, quality standards and plant records, held where the line can reach them.
What it already knows
Standard operating procedures
Quality standards
Maintenance manuals
Batch records
Incident reports
Departments and desks
01
Production operations
02
Quality operations
Representative questions it answers
- What does the SOP require when this reading goes out of range?
- Which batches were affected the last time this deviation was raised?
- What is the maintenance interval for this machine, and when was it last done?
Workflows it runs
Draft a deviation report with the procedure cited
retrieve → draft → check
Prepare a quality review from batch records
retrieve → draft → check
Who it is for
Plant managers, line supervisors, quality officers and maintenance planners.
IASI
Manufacturing · trial corpus
Pick a question. The trial answers from a small sample of Manufacturing documents only — the third question is deliberately outside the corpus, so you can see the refusal.
answer
When the reading leaves the stated range the SOP requires the line to be held, the deviation logged, and quality notified before restart. SOP-114 §3.4 The same deviation was raised on two earlier batches; both were released after rework under a documented concession. Batch record B-2291
passages considered 146
survived relevance stage 6
citations 2
Launch IASI
rate-limited trial tenant